Loading...
Project + Control 16x9
Pachama Insights

Baseline for Validation

Baselines made simple so you can validate with confidence

Baseline Graph with caption

Validation-ready in days

Get everything you need to build a compelling case for your dynamic baseline in your Project Design Document (PDD).

  • Dynamic baseline with project and control plots compliant with ARR standards (e.g., VM0047)
  • Downloadable figures and descriptions ready to drop directly into your PDD
  • Technical appendices to answer tough questions from validators
  • Results ready for review in <10 days

Confidently share your project’s story

When you work with Pachama, you can:

  • Get turnkey results & expert support: Plug-and-play assets, hands-on review and on-demand support for standards, buyer, and VVB questions.
  • Partner with pros: We’ve run baselines on hundreds of projects and led the market in dynamic baseline development.
  • Access leading tech: A rigorous matching approach to create a robust performance benchmark. Our Canopy Height Model creates custom stocking indexes tailored to your project area – it can detect forest growth even when satellite imagery can’t.

Baseline deep dive

  • What to expect
    • Database with project and control plots compliant with ARR standards (e.g., VM0047).
    • Ex-ante baseline with forecasted deductions.
    • Match quality metrics, baseline trends, and geospatial layers for stocking index over time.
    • Turnkey narrative, graphics, and technical appendix for your PDD.

     

    Apr 14 Image34
  • We're here to help
    • Forest science, technology and carbon market expertise at your fingertips.
    • Hands-on session to dive into results and methodology requirements.
    • On-demand support for questions from Standards and Validation and Verification Bodies (VVBs).
    Apr 14 Image34
  • About our tech
    • Canopy Height Model trained on high-quality LiDAR data that is locally calibrated for your project area.
    • Option to fine-tune the model with your own inventory or LiDAR data.
    • Pixel-matching for the entire project area for more predictable monitoring and issuance results.

     

    Apr 14 Image34
ASK GAIA
Ask Gaia

Talk to Gaia, Pachama's AI
guide for anything

ASK GAIA